By the CHC Remodel team in Kirkland, WA · Last updated: October 26, 2026
A kitchen remodel is one of the biggest projects most Seattle homeowners take on. The price depends far more on scope than on square footage. Here are the cost ranges CHC Remodel sees on its own kitchen projects, where the money goes, and how to set a budget that holds up once walls are opened.
Quick answer: In 2026, a kitchen remodel in Seattle typically costs $10,000–$30,000 for a basic update, $30,000–$60,000 for a mid-range remodel and $60,000–$120,000 for a high-end renovation. These are CHC Remodel’s estimates from its projects. Cabinetry is the biggest single cost at about 30% of the budget, and labor and permits take another 20–25%. Set aside an extra 10–15% for surprises.
Average kitchen remodel cost in Seattle (2026)
| Remodel level | Typical cost | What it usually involves |
|---|---|---|
| Basic | $10,000–$30,000 | Same layout, refreshed surfaces, prefab or stock cabinets, laminate or entry-level counters |
| Mid-range | $30,000–$60,000 | New semi-custom cabinets, stone counters, new appliances and lighting, mostly the same layout |
| High-end | $60,000–$120,000 | Custom cabinetry, premium appliances, layout changes such as moving plumbing or removing walls |
These ranges are starting points, not quotes. Two kitchens of the same size can land in different tiers because of the choices described below.

Where the money goes: kitchen remodel cost breakdown
The table shows the typical share of the budget for each part of the job, and what that means in dollars on a $50,000 mid-range remodel.
| Category | Share of budget | On a $50,000 remodel |
|---|---|---|
| Cabinetry and hardware | About 30% | About $15,000 |
| Countertops | 10–15% | $5,000–$7,500 |
| Appliances | 10–20% | $5,000–$10,000 |
| Plumbing and electrical | 10–15% | $5,000–$7,500 |
| Flooring and finishes | 10–15% | $5,000–$7,500 |
| Labor and permits | 20–25% | $10,000–$12,500 |
The shares are ranges, so they don’t add up to exactly 100%. A kitchen with high-end appliances, for example, sits at the top of the appliance range and lower elsewhere.
Why cabinets cost the most
Cabinets fill most of the room, decide the layout, and take the most work to build and install. That’s why they take the largest share of almost every kitchen budget. For more on choosing them, see our guide to custom kitchen cabinets or our custom kitchen cabinet service.

What pushes a Seattle kitchen remodel up or down
Custom vs. prefab cabinetry
Prefab (stock) cabinets come in set sizes and finishes, and they cost the least. Semi-custom cabinets add sizes and finish options. Custom cabinets are built to your exact dimensions. Moving from stock to custom is often the single largest jump between the basic and high-end tiers.
Stone vs. laminate countertops
Laminate keeps costs down. Quartz, granite and other stone cost more for both the material and the cutting and shaping, and more again with a waterfall edge, full-height backsplash or a large island.
Structural changes
Keeping the sink, range and walls where they are is the biggest way to control cost. Removing a wall, moving plumbing or adding circuits brings in more trades, more time and sometimes engineering. Load-bearing walls need a properly designed beam and support.

Age and condition of the home
Many Seattle-area homes are decades old. Once cabinets and drywall come off, older wiring, plumbing or framing can need updating before new work goes in. You can’t always see this at the estimate stage, which is why the contingency below matters.
How to budget for your kitchen remodel
Plan a 10–15% contingency
A contingency is extra money set aside for surprises. Keep 10–15% of the project cost aside for problems found once old cabinets and walls come out. On a $50,000 remodel, that is $5,000–$7,500. If you don’t need it, it can go toward upgrades at the end.
Put quality into the cabinets
Cabinets are usually the longest-lasting part of a kitchen and the hardest part to replace later. Saving on a light fixture is easy to undo. Saving on cabinet boxes and hardware usually isn’t.
Choose efficient lighting and fixtures
LED lighting lowers running costs for as long as you own the kitchen. ENERGY STAR says certified LED lighting uses 90% less energy and can last 25 times longer than incandescent lighting (ENERGY STAR). A water-saving faucet adds a smaller saving every day.
Keep the scope written down
Changes made after work starts are a common reason budgets grow. Settle the layout, cabinet line, counters and appliances before construction, and price any later change in writing.

For how long each stage takes, see our remodel timeline guide. For ways to trim cost, see these budget-friendly kitchen ideas.
How CHC Remodel prices a kitchen
CHC Remodel is a Kirkland-based remodeling company serving Seattle and the Eastside. We price from a defined scope, not a square-foot guess. We start with a consultation about your goals and budget range, then review the existing kitchen, including walls, plumbing, electrical and structure. Next we turn your ideas into a buildable plan with an estimate based on that plan. Our CEO, Siamak Firooz, is a structural engineer, so wall removals and layout changes are checked in-house before they are priced. Read more about our kitchen remodeling work and our remodeling process.
We remodel kitchens across Seattle and the Eastside, including Kirkland, Bellevue and Redmond. You can read what homeowners say about us in our Google reviews.
Frequently asked questions
How much does a mid-range kitchen remodel cost in Seattle?
CHC Remodel’s mid-range projects typically cost $30,000–$60,000. That usually covers new semi-custom cabinets, stone counters, new appliances and lighting, with the layout mostly unchanged.
What is the most expensive part of a kitchen remodel?
Cabinetry, at about 30% of the total budget. Labor and permits together come next, at 20–25%.
How much contingency should I add to a kitchen budget?
Plan 10–15% on top of the project cost. On a $50,000 kitchen, that is $5,000–$7,500.
Does removing a wall make a kitchen remodel much more expensive?
Usually, yes. Moving walls or plumbing is one of the main reasons a project moves from the mid-range to the high-end tier. A load-bearing wall also needs a beam designed to carry the load.
How do I get an accurate price for my kitchen?
Get a site visit and a written scope. A price based on your actual kitchen, your layout and your chosen materials is far more reliable than a cost-per-square-foot figure.
Get a tailored estimate for your kitchen
Whether you’re planning a modest update or a full custom kitchen, an estimate built on your own scope is the most reliable number you can get. Call CHC Remodel at (425) 448-6680 or contact us to start.
CHC Remodel · Contemporary Home Construction, LLC · 11335 NE 122nd Way Suite 105, Kirkland, WA 98034 · WA registration CONTEHC837KA
Verified Credentials
WA L&I registration
CONTEHC837KA
★★★★★ 80+ five-star Google reviews
250+ reviews across other directories
Contemporary Home Construction, LLC (CHC Remodel). Look us up with the same free state tool this checklist recommends.
Planning a Remodel?
Tell us about your project and we will walk through scope, structure and next steps.


